In 1900 the flow of the Chicago River was permanently reversed in order to prevent sewage from flowing into Lake Michigan

Tuesday, September 14, 2021

The Chicago Sanitary and Ship Canal, historically known as the Chicago Drainage Canal, is a 28-mile-long (45 km) canal system that connects the Chicago River to the Des Plaines River. It reverses the direction of the Main Stem and the South Branch of the Chicago River, which now flows out of Lake Michigan rather than into it. The related Calumet-Saganashkee Channel does the same for the Calumet River a short distance to the south, joining the Chicago canal about halfway along its route to the Des Plaines. The two provide the only navigation for ships between the Great Lakes Waterway and the Mississippi River system.


The canal was primarily built as a sewage treatment scheme. Prior to its opening in 1900, sewage from the city of Chicago was dumped into the Chicago River and flowed into Lake Michigan. The city's drinking water supply was (and remains) located offshore, and there were fears that the sewage could reach the intake and cause serious disease outbreaks. Since the sewer systems were already flowing into the river, the decision was made to dam the river and reverse its flow, thereby sending all the sewage inland where it could be treated before emptying it into the Des Plaines.


A secondary goal was to replace the shallow and narrow Illinois and Michigan Canal (I&M), which had originally connected Lake Michigan with the Mississippi starting in 1848. As part of the construction of the new canal, the entire route was built to allow much larger ships to navigate it. It is 202 feet (62 m) wide and 24 feet (7.3 m) deep, over three times the size of the I&M. The I&M became a secondary route with the new canal's opening and was shut down entirely with the creation of the Illinois Waterway network in 1933.


The building of the Chicago canal served as intensive and practical training for engineers who later built the Panama Canal. The canal is operated by the Metropolitan Water Reclamation District of Greater Chicago. In 1999, the system was named a Civil Engineering Monument of the Millennium by the American Society of Civil Engineers (ASCE). The Canal was listed on the National Register of Historic Places on December 20, 2011.


Reasons for construction

Early Chicago sewage systems discharged directly into Lake Michigan or into the Chicago River, which itself flowed into the lake. The city's water supply also comes from the lake, through water intake cribs located two miles offshore. There were fears that sewage could infiltrate the water supply, leading to typhoid fever, cholera, and dysentery. During a tremendous storm in 1885, the rainfall washed refuse from the river far out into the lake (although reports of an 1885 cholera epidemic are untrue), spurring a panic that a future similar storm would cause a huge epidemic in Chicago. The only reason for the storm not causing such a catastrophic event was that the weather was cooler than normal. The Sanitary District of Chicago (now The Metropolitan Water Reclamation District) was created by the Illinois legislature in 1889 in response to this close call.


In addition, the canal was built to supplement and ultimately replace the older and smaller Illinois and Michigan Canal (built 1848) as a conduit to the Mississippi River system. In 1871, the old canal had been deepened in an attempt to reverse the river and improve shipping but the reversal of the river only lasted one season.[4] The I&M canal was also badly polluted as a result of unrestricted dumping from city sewers and industries, such as the Union Stock Yards.


Planning and construction, 1887–1922

By 1887, it was decided to reverse the flow of the Chicago River through civil engineering. Engineer Isham Randolph noted that a ridge about 12 miles from the lakeshore divided the Mississippi River drainage system from the Great Lakes drainage system. This low divide had been known since pre-Columbian time by the Native Americans, who used it as the Chicago Portage to cross from the Chicago River drainage to the Des Plaines River basin drainage. The Illinois and Michigan Canal was cut across that divide in the 1840s. In an attempt to better drain sewage and pollution in the Chicago River, the flow of the river had already been reversed in 1871 when the Illinois and Michigan Canal was deepened enough to reverse the river's flow for one season. A plan soon emerged to cut through that ridge and carry wastewater away from the lake, through the Des Plaines and Illinois rivers, to the Mississippi River and the Gulf of Mexico. In 1889, the Illinois General Assembly created the Sanitary District of Chicago (SDC) to carry out the plan. After four years of turmoil during construction, Isham Randolph was appointed Chief Engineer for the newly formed Sanitary District of Chicago and resolved many issues circulating around the project. While the canal was being built, permanent reversal of the Chicago River was attained in 1892, when the Army Corps of Engineers further deepened the Illinois and Michigan Canal.


One of the issues for Randolph to resolve was a strike of about 2000 union workers, centered in Lemont and Joliet. On June 1, 1893, quarrymen went out to protest a wage cut, an action that also drew in 1200 canal workers. Reports describe 400 quarrymen marching along the length of the canal project on June 2, between Lemont and Romeo, conducting a "reign of terror" at worksites, "armed with clubs and revolvers", "almost crazed with liquor".[6] On the 9th strikers clashed with replacement workers and local law enforcement, and Governor Altgeld called out the First and Second Regiments of the Illinois National Guard. Dozens were wounded and at least five killed: strikers Gregor Kilka, Jacob (or Ignatz) Ast, Thomas Moorski, Mike Berger, and 17-year-old bystander John Kluga. The strike was settled by the 15th.


The new Chicago Sanitary and Ship Canal, linking the south branch of the Chicago River to the Des Plaines River at Lockport, and in advance of an application by the Missouri Attorney General for an injunction against the opening, opened on January 2, 1900. However, it was not until January 17 that the complete flow of the water was released. Further construction from 1903 to 1907 extended the canal to Joliet, as the SDC wanted to replace the previously built Illinois and Michigan Canal with the Chicago Sanitary and Ship Canal. The rate of flow is controlled by the Lockport Powerhouse, sluice gates at Chicago Harbor and at the O'Brien Lock in the Calumet River, and also by pumps at Wilmette Harbor. Two more canals were later built to add to the system: the North Shore Channel in 1910, and the Calumet-Saganashkee Channel in 1922.


Construction of the Ship and Sanitary Canal was the largest earth-moving operation that had been undertaken in North America up to that time. It was also notable for training a generation of engineers, many of whom later worked on the Panama Canal.[14] In 1989, the Sanitary District of Chicago has renamed the Metropolitan Water Reclamation District of Greater Chicago.


Diversion of water from Great Lakes

The Chicago Sanitary and Ship Canal are designed to work by taking water from Lake Michigan and discharging it into the Mississippi River watershed. At the time of construction, a specific amount of water diversion was authorized by the United States Army Corps of Engineers (USACE) and approved by the Secretary of War, under provisions of various Rivers and Harbors Acts; over the years, however, this limit was not honored or well regulated. While the increased flow more rapidly flushed the untreated sewage, it also was seen as a hazard to navigation, a concern to USACE in relation to the level of the Great Lakes and the St. Lawrence River, from which the water was diverted. Litigation ensued from 1907, which eventually saw states downstream of the canal siding with the sanitary district and those states upstream of Lake Michigan with Canada siding against the district. The litigation was eventually decided by the Supreme Court in Sanitary District of Chicago v. the United States in 1925, and again in Wisconsin v. Illinois in 1929. In 1930, management of the canal was turned over to the United States Army Corps of Engineers. The Corps of Engineers reduced the flow of water from Lake Michigan into the canal but kept it open for navigation purposes. These decisions prompted the sanitary district to accelerate its treatment of raw sewage.[citation needed] Today, diversions from the Great Lakes system are regulated by an international treaty with Canada,[citation needed] through the International Joint Commission, and by governors of the Great Lakes states.